Video – Hold back the river…

Canal temporarily diverted during complex aqueduct demolition works.

Electrified railway lines and large volumes of canal water do not a good mix make. So this incredible film demonstrates the engineering ingenuity required to replace an aqueduct over a railway line.

The time-lapse footage from Network Rail shows the Forth and Clyde canal being drained and the demolition and replacement of the Carmuirs twin railway tunnels beneath the waterway.

Network Rail Time Lapse Footage of Carmuirs Aqueduct Works from Rail Technology Magazine on Vimeo.